Paint Horses for Sale near New Town, ND

Post Free Ad
Advanced Search
Paint Stallion
This stallion is a 85-90% color producer. He has Overo markings. His color..
Dunn Center, North Dakota
Paint
Stallion
-
Dunn Center, ND
ND
$3,500
Paint Mare
The sire is GosignmanGo and the Dam is She is a FancyJet. She has a lot of..
Dunn Center, North Dakota
Paint
Mare
-
Dunn Center, ND
ND
$2,500
1

About New Town, ND

In 1944, the United States Congress authorized the Garrison Dam and Reservoir Project. The dam was planned to be the world's largest rolled-earth filled dam and would create the second-largest reservoir in the world to collect water for irrigation and regional water needs. It would form a lake 200 miles long, 14 miles wide in some places and have roughly 1,500 miles of shoreline. In order to make this dam and reservoir, the towns of Sanish, Elbowoods, Lucky Mound, Shell Creek, Nishu, Charging Eagle, Beaver Creek, Red Butte, Independence, and Van Hook had to be dissolved and the residents relocated before the area was flooded. A total of seven possible sites were inspected before the present site was chosen.